Today was a good day. The weather was beautiful, and SO and I had a lovely snuggle and sleep in this morning. We so rarely do that, and it’s so nice when we do. Normally as soon as I’m awake, I’m out of bed doing stuff, but not today. It was great.
Then we got up and had a leisurely breakfast, then got ready and went to the unit. I spent all day (about six hours) in the bathroom. While the tiling’s finished, the walls and ceiling needed a fair bit of remedial patching, which took a while. I had an extra special bonus when I was patching the ceiling – a huge chunk of plaster dropped off and nearly got my eye. Fortunately I saw it coming and took evasive action.
SO spent the day sanding the two bedrooms which I’d patched a week or so ago. He hates doing it, and I do some of it, but I’m just not physically strong enough to keep holding the sander for any length of time. He did a fair bit, I think he’s finished the main bedroom. We agreed tonight that all the walls and ceilings are going to need a coat of sealer prior to actually painting them the colours we’ve chose. They’re in such poor condition, we can’t bring ourselves to just paint straight onto them without some preemptive action being taken first.
We’re probably going to go back tomorrow night after work to do some more. Ideally I’d like to get the bathroom all ready for painting in a couple of days’ time, but that will take some serious work at night time, which is hard on the eyes (and the body). However, we’re getting there, slowly but surely.